The Canyon method

80% HAPPENS BEFORE WE ARRIVE ON SITE.

Our patent-pending prefabricated system is built under controlled factory conditions on our manufacturing line in Braemar, NSW. This includes racking, solar modules, wiring and waterproofing. Roughly 80 percent of the build is complete before a single component leaves the factory, so by the time our team arrives on site the complex work is already done.

The result is a faster, safer and more predictable installation than anything built in the field. Fewer weather delays. Fewer quality control issues. A firm programme you can plan around.

80%

Factory build (off-site)

20%

On-site installation

What happens in the factory

  • Panel mounting and racking

  • Integrated waterproofing

  • Lighting pre-wired

  • Full electrical wiring

  • EV charging enclosures

  • Quality controlled fabrication

2 weeks

average on-site install per 300kWp deployed

75%

fewer high-risk on-site labour hours

3x

faster than traditional field-built construction

HOW IT WORKS

1

2

5

HANDOVER

Commissioning, documentation and a full walk-through, then you take ownership of a fully operational canopy.

SITE INSPECTION & ENGAGEMENT

Provided you are happy with the proposal, we can complete a site inspection, complete any works required (geotech, underground services scan and electrical infrastructure inspection) to give a fixed price quote.

PROPOSAL

Provide us with a site location and the car spaces you need covered and we can turn around a rapid proposal.





3

4

SITE INSTALLATION

Our specialist installation team coordinate an installation that works around your site, Typical installation time is 3 weeks for a 250kWp/80 car-bay site.

PRODUCTION

Once engaged, it typically takes 3 months to procure the materials and manufacture the solar pods ready for site installation.

16

Projects across 3 states

3,170 kWp

Total portfolio capacity

20 MWp

Annual NSW factory capacity

~3,200 t

CO avoided per year