The Canyon method80% HAPPENS BEFORE WE ARRIVE ON SITE.
Our patent-pending prefabricated system is built under controlled factory conditions on our manufacturing line in Braemar, NSW. This includes racking, solar modules, wiring and waterproofing. Roughly 80 percent of the build is complete before a single component leaves the factory, so by the time our team arrives on site the complex work is already done.
The result is a faster, safer and more predictable installation than anything built in the field. Fewer weather delays. Fewer quality control issues. A firm programme you can plan around.
80%
Factory build (off-site)
20%
On-site installation
What happens in the factory
Panel mounting and racking
Integrated waterproofing
Lighting pre-wired
Full electrical wiring
EV charging enclosures
Quality controlled fabrication
2 weeks
average on-site install per 300kWp deployed
75%
fewer high-risk on-site labour hours
3x
faster than traditional field-built construction
HOW IT WORKS
1
2
5
HANDOVER
Commissioning, documentation and a full walk-through, then you take ownership of a fully operational canopy.
SITE INSPECTION & ENGAGEMENT
Provided you are happy with the proposal, we can complete a site inspection, complete any works required (geotech, underground services scan and electrical infrastructure inspection) to give a fixed price quote.
PROPOSAL
Provide us with a site location and the car spaces you need covered and we can turn around a rapid proposal.
3
4
SITE INSTALLATION
Our specialist installation team coordinate an installation that works around your site, Typical installation time is 3 weeks for a 250kWp/80 car-bay site.
PRODUCTION
Once engaged, it typically takes 3 months to procure the materials and manufacture the solar pods ready for site installation.
16
Projects across 3 states
3,170 kWp
Total portfolio capacity
20 MWp
Annual NSW factory capacity
~3,200 t
CO₂ avoided per year